This installation guide provides step-by-step instructions for setting up the Μηχανή ξεριζώματος κόκκινων φασολιών 4BYQ-2.6 (4-Ridge Forward Push), Στρογγυλή πρέσα 9YG-2.24D, and 9JYY-2.5 Round Bale Picking and Transporting Machine. Follow the detailed instructions carefully to ensure proper installation and optimal machine performance.
1. Type 4BYQ-2.6 Kidney Bean Uprooting Machine (4-Ridge Forward Push)
Tools Required:
Wrenches
Pliers
Hydraulic oil
Screwdrivers
Torque wrench
Safety gloves
Step 1: Unpacking the Equipment
Upon receiving the 4BYQ-2.6 Kidney Bean Uprooting Machine, carefully unpack the unit. Remove any protective packaging material and ensure all components are intact, including the 5-ridge uprooting mechanism, hydraulic system, wheels, and frame.
Step 2: Assembly of the Main Components
Attach the Hydraulic System: Position the hydraulic pump and lines. Ensure all hydraulic connections are tightly secured to prevent leaks.
Install the 5-Ridge Uprooting System: Align the 5-ridge system to the main frame and secure it using bolts provided. Tighten them to the recommended torque specifications (found in the user manual).
Attach the Wheels: Install the wheels according to the diagram. Secure them with the appropriate nuts and tighten them with a torque wrench.
Connect the Power Supply: Attach the machine to a tractor or power source. Ensure that the connection is securely fastened to avoid any disconnections during operation.
Step 3: Hydraulic Oil Filling
Fill the hydraulic system with the recommended hydraulic oil. Check the oil level using the dipstick to ensure it’s within the specified range.
Step 4: Testing and Calibration
Once all components are installed, start the machine and test the hydraulic functions, including the picking mechanism. Ensure the 5-ridge system operates smoothly and adjusts correctly.
Step 5: Final Inspection
Before using the machine, double-check all connections, bolts, and fluid levels to ensure the machine is properly set up and ready for operation.
2. 9YG-2.24D Round Baler
Tools Required:
Wrenches
Pliers
Hydraulic oil
Grease gun
Torque wrench
Safety gloves
Step 1: Unpacking the Equipment
After receiving the 9YG-2.24D Round Baler, carefully inspect the package for any damage during shipping. Remove all packaging materials and ensure all components are present.
Step 2: Mounting the Round Baler
Attach the Hitch: Begin by attaching the hitch to the tractor. Use the provided bolts and secure them tightly with a wrench. The hitch should be aligned with the tractor’s towing system.
Install the Pickup Mechanism: Install the pickup system, ensuring the rollers are properly aligned. This component is crucial for the smooth feeding of hay and straw into the baler.
Mount the Hydraulic System: Connect the hydraulic lines to the baler according to the provided schematic. Ensure there are no leaks, and the hydraulic lines are tightly connected.
Step 3: Baler Setup
Position the Baler’s Rollers: Adjust the rollers and feed mechanisms to the recommended settings for optimal bale size and density.
Install the Net Binding System: Follow the user manual to install the net binding system. Secure all components and ensure the netting mechanism is correctly aligned.
Step 4: Lubrication and Fluid Check
Before starting the baler, check the hydraulic fluid levels. Ensure the machine is properly lubricated using a grease gun for the moving parts, such as the rollers and feeding system.
Step 5: Test Run
After installation, conduct a test run. Operate the 9YG-2.24D Round Baler for a short period to ensure the pickup system is feeding properly and the bales are being tied securely.
3. Excellent Type 9JYY-2.5 Round Bale Picking and Transporting Machine
Tools Required:
Wrenches
Torque wrench
Grease gun
Safety gloves
Hydraulic oil
Screwdrivers
Lifting equipment (if necessary)
Step 1: Unboxing and Inspection
Upon receiving the 9JYY-2.5 Round Bale Picking and Transporting Machine, carefully unbox the unit. Verify that all components are intact, including the lifting arms, wheels, hydraulic hoses, and the pickup mechanism.
Step 2: Attaching the Traction System
Attach the Hitch: Use the provided bolts to secure the hitch of the 9JYY-2.5 to your tractor. Ensure the hitch is properly aligned and the bolts are tight to avoid accidents during transport.
Install the Pickup and Lifting Mechanism: Attach the pickup mechanism to the main frame. Ensure the hydraulic components are connected correctly for lifting and lowering the bales.
Install the Wheels: Using a wrench, install the wheels on the machine. Tighten the bolts to the recommended torque to ensure stability during operation.
Step 3: Hydraulic System Setup
Connect the hydraulic lines from the tractor to the 9JYY-2.5. Check the hydraulic oil level and ensure that the fluid is clean and at the correct level before proceeding. Tighten all connections to prevent leaks.
Step 4: Installation of the Bale Picking System
Position the Pickup Rollers: Align the rollers correctly to ensure the bales are picked up smoothly from the field.
Check the Bale Storage: Ensure that the storage area for the bales is correctly positioned and secured. Check for any obstructions that may prevent the smooth transfer of bales.
Step 5: Testing the Machine
Once the 9JYY-2.5 is fully assembled, perform a test run. Test the hydraulic system by raising and lowering the pickup arms, ensuring they work smoothly and without obstruction.
Make sure the bales are picked up properly and stored without any issues.
Step 6: Final Checks
Before operating the machine, check all bolts, hydraulic lines, and lubricated parts. Ensure everything is secure, and verify that the bales are being stored correctly.
General Maintenance Tips:
Check Hydraulic Fluids: Regularly check hydraulic fluid levels and ensure that they are within the required range. Clean hydraulic filters as needed.
Lubrication: Apply grease to all moving parts regularly, such as the rollers, bearings, and feed mechanisms. Ensure the pickup and lifting arms are properly lubricated.
Cleaning: After each use, clean the machines thoroughly to remove debris, dirt, or crop residue. This prevents clogging and ensures smooth operation.
Inspect for Wear: Regularly inspect all components for signs of wear or damage, including hydraulic hoses, rollers, and electrical systems. Replace worn parts immediately to avoid breakdowns.
By following these installation and maintenance guidelines, you can ensure the long-lasting performance of the 4BYQ-2.6 Kidney Bean Uprooting Machine, 9YG-2.24D Round Baler, and 9JYY-2.5 Round Bale Picking and Transporting Machine in your farming operations.


